Styrene Plant Condenser Replacement Project

Approximate Total Installed Cost: $23,000,000

Year: 2006

Plant Location: Louisiana

ECI Scope: Conceptual and detail engineering/design

Project Scope Highlights:

  • Designed new 40% larger condenser
  • Designed/modified piping and structural supports (larger nozzles, loads, & thermal expansion)
  • Was constructed by two different companies in Italy (SICES SpA. and Koch SrI)
  • It took 22 months to fabricate
  • The condenser is 14 feet in diameter, 126 feet tall and 607 tons
Share Tweet Pin it