LDPE/ EVA Plant Copolymer Project

Approximate Total Installed Cost: $50,000,000

Year: 2010-2012

Plant Location: Korea

ECI Scope: Engineering/Design (Conceptual through Detail), Construction Management, Startup Support

Project Scope Highlights:

  • Modified secondary compressor for 30% increased capacity
  • Modified reactor configuration for increased overall length
  • Added cooling capacity to secondary compressor precoolers and intercoolers
  • Modified extrusion and debottlenecked pneumatic transfer/finishing systems for increased capacity