LDPE Plant Capacity Expansion Project #2

Approximate Total Installed Cost: $15,000,000

Year: 2013-2015

Plant Location: Texas

ECI Scope: Engineering/Design (Conceptual through Detail), Construction Management, Startup Support

Project Scope Highlights:

  • Added 4th peroxide injection point and increased length of tubular reactor by installing new reactor preheater
  • Added new primary compressor discharge cooling capacity (increase secondary compressor throughput)
  • Added/modified peroxide injection system