LDPE Plant Copolymer Conversion Project

Approximate Total Installed Cost: $50,000,000

Year: 2013-2015

Plant Location: Louisiana

ECI Scope: Engineering/Design (Conceptual through Detail), Procurement, Construction Management, Startup Support

Project Scope Highlights:

  • Modified existing homopolymer (LDPE) line to produce high % EVA’s
  • Added reactor aftercooler
  • Modified extrusion/pelletization, pneumatic transfer/finishing systems for handling high% EVA’s
  • Added VA unloading and storage systems
  • Added VA recovery and purification systems
Share Tweet Pin it